Thursday, 15 December 2016

Upstairs at Eric's (the Bennett's)




All but the grouting is finished upstairs! Really pleased with the finish, it's as good as we hoped for and then some!

 

Drive

The drive was done while we watched.....less than 30 minutes!


No surprise really, these guys built our house in 6 months when everyone else said 9-10.


Sunday, 11 December 2016

Take a look around

 
Downstairs decorating is nearly done. Just can't finish off because of the missing doors and skylight.

We really could have been done by Christmas if it wasn't for Double D installation. Their last chance is In 2 days, they've promised to fit the skylight and garage side door.

Panoramic picture from the front door....it's a bit bendy but you can see the whole thing in one shot.


Saturday, 10 December 2016

Sunday, 4 December 2016

I've Got The Power!

Electric main is connected....we have power! 
Silver Travertine flooring going in too, it's going to look really good I think.